We closed on our house and got the keys on June 25th!!!!!
We had pizza dinner at our new house tonight and talked about work to do.
First things first: we HAD to take out the carpet in the dining area and entry way.
Upon carpet removal we discovered a few hiccups along the way. The sub-floor has a sub-floor! so Mike and his dad chiseled out the Sheetrock mud and shoveled up the sub-flooring to make it level for our laminate to go in.
There was also carpet in the bathrooms upstairs and as with any good housing project it was like opening Pandora's box. The toilet had been leaking so we had to cut out some of the sub-flooring down to the floor joices to get rid of the soft mushy wood.
I am so grateful for the dad's in my life. Jim and Dawn came by to help us with a few projects especially the bathroom. We took everything out to get it ready for sub-floor repair and tile.
There were popcorn ceiling in the rooms upstairs. Mike and my dad removed them and once they were dried out my dad did a texture for us. When that was dry we painted them.
In the master bedroom the walls were like a sea foam color and as I was patching and sanding I noticed a couple seams and realized it was partially wallpaper so I worked on taking that down. Once the wall paper was down there was a spot where my dad came and fixed with sheet rock mud. Once that was all dry we were ready to paint.
There was no lighting in the bedrooms upstairs so in the kids room we installed a light and in the master we installed ceiling fans with lights. We have a lot of work to do but it's coming along.













No comments:
Post a Comment